LADWP Annual Owens Valley Report
The 1997 MOU requires LADWP and Inyo County to prepare an annual report describing environmental conditions in the Owens valley. Each agency prepares an annual report independently although much of the same data are contained in both reports. Beginning in 2010, LADWP included the final Operations Plans in its Annual Report. The LADWP annual report also contains results of activities it was required to perform by the Agreement and associated governing documents, that do not involve Inyo County staff. Below are links to LADWP’s annual reports
DRAFT 2024 LADWP Annual Owens Valley Report
2023 LADWP Annual Owens Valley Report
2022 LADWP Annual Owens Valley Report
2021 LADWP Annual Owens Valley Report
2020 LADWP Annual Owens Valley Report
2019 LADWP Annual Owens Valley Report
2018 LADWP Annual Owens Valley Report
2017 LADWP Annual Owens Valley Report
2016 LADWP Annual Owens Valley Report
2015 LADWP Annual Owens Valley Report
2014 LADWP Annual Owens Valley Report
2013 LADWP Annual Owens Valley Report
2012 LADWP Annual Owens Valley Report
2011 LADWP Annual Owens Valley Report
2010 LADWP Owens Valley Annual Report
2009 LADWP Owens Valley Annual Report (4 MB)
2009 Annual Report broken down by section:
- Cover
- Contents
- Summary
- Section 1 – Introduction
- Section 2 – Operations Plan
- Section 3 – Conditions
- Section 4 – E/M Projects
- Section 5 – Mitigation Measures
- Section 6 – Status of Other Projects
- Appendix A – Bishop Cone Audit
2008 Annual Report broken down by section:
- Cover
- Table of Contents – Summary
- Section 1 – Introduction
- Section 2 – Operations Plan
- Section 3 – Owens Valley Conditions
- Section 4 – Enhancement/Mitigation Project Status
- Section 5 – Mitigation Project Status
- Section 6 – Status of Other Studies, Projects, and Activities
- Appendix – Bishop Cone Audit – 2006-07
2007 Annual Report broken down by section:
- Front Cover (0.2MB)
- Front Matter (0.02MB)
- Section 1 – Introduction (0.02MB)
- Owens Valley Operations Plan – Section 2 (1.6MB)
- Owens Valley Conditions – Section 3 (1.6MB)
- E/M Project Status – Section 4 (0.2MB)
- Mitigation Measure Status – Section 5 (0.2MB)
- Status of Other Studies – Section 6 (0.2MB)
- LORP Pump Station Report – Section 7 (0.2MB)
- Bishop Cone Audit – 2005-06 (0.2MB)
2006 Annual Report broken down by section:
- Bishop Cone Audit (4MB)
- Front Matter
- Section 1: Introduction
- Section 2: Operations Plan (1.5MB)
- Section 3: Owens Valley Conditions (2.0MB)
- Section 4: Enhancements/Mitigation Project Status
- Section 5: Mitigation Measure Status
- Section 6: Status of Other Studies
2005 Annual Report broken down by section:
- Cover Page
- TOC & Summary
- Section 1: Introduction
- Section 2: Annual Owens Valley Operations Plan (includes groundwater pumping)
- Section 3: Conditions in the Owens Valley
- Section 4: Enhancement/Mitigation Projects
- Section 5: 1991 Environmental Impact Report Mitigation Measure Status
- Section 6: Status of Other Studies, Projects, and Activities
- Bishop Cone Audit